banner
Home / Blog / ADVERTISEMENT FOR BIDS CITY OF MAYVILLE
Blog

ADVERTISEMENT FOR BIDS CITY OF MAYVILLE

Oct 02, 2023Oct 02, 2023

ADVERTISEMENT FOR BIDS CITY OF MAYVILLE MAYVILLE, NORTH DAKOTA SEWER AND WATER IMPROVEMENT DISTRICT NO. 2022-2 SANITARY SEWER AND WATER MAIN REPLACEMENT MOORE PROJECT NO. 21675 General Notice Owner is requesting Bids for the construction of the project listed above. Bids for the construction of the Project will be received and accepted via electronic bid (vBid) through QuestCDN until June 28, 2023 at 10:00 a.m. local time. Bids will be viewed and read via video/phone conference at 10:30 a.m. Mailed or hand delivered bids will not be opened or considered. Link for the video/phone conference is provided at www.mooreengineeringinc.com by clicking the Bid Information tab, or at www.questcdn.com . The Project includes the following Work: Removal of asbestos cement pipe (ACP), installation of water main and services, sanitary sewer main, services, and manholes, curb and gutter, valley gutter, concrete flatwork, asphalt pavement, and miscellaneous construction items. Obtaining the Bidding Documents Digital project bidding documents will be available at www.mooreengineeringinc.com by clicking the Bid Information tab, or at www.questcdn.com. You may download the complete set of digital documents for a nonrefundable fee of $50.00 by locating eBidDoc™ Number 8157710 on the website. Contact QuestCDN Customer Support at 952-233-1632 or [email protected] for assistance in membership registration, downloading digital project information, and vBid online bid submittal questions. Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Issuing Office for the Bidding Documents is: Moore Engineering, Inc. 925 10th Ave E, Suite1, West Fargo, ND 58078 Each bid must be accompanied by a bidder's bond in a sum equal to 5% of the full amount of the bid executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and a contract is awarded to the principal, the principal, within ten (10) days after the notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond, and any conditions of the City of Mayville, as required by law. A countersignature of a bid bond is not required. If the City of Mayville elects to award a contract to the lowest responsible bidder, and the lowest responsible bidder does not execute a contract within ten (10) days, the bidder's bond will be forfeited to the City of Mayville, and the City of Mayville may award the project to the next lowest responsible bidder. Each bidder must possess a valid North Dakota contractor's license for the full amount of their bid, as required by N.D.C.C. § 43-07-7. Each bidder MUST enclose a copy of their Contractor's License or Certificate of Renewal, issued by the North Dakota Secretary of State, and each license must be valid and dated at least 10 days prior to the date set for bid opening, as required under N.D.C.C. § 43-07-12. Bidders on this work will be required to comply with Title 40 CFR Part 33– Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the Project Manual. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, and Pig iron and direct reduced iron. This Advertisement is issued by: Owner: City of Mayville By: Gail Olstad Title: City Auditor Date: June 6, 2023 (June 7, 14 & 21, 2023) 230391